ALECO
Albay Electric Cooperative, Inc.
Albay, Region V
Albay Electric Cooperative, Inc.
Albay, Region V
9 results
Oas: Badbad, Banao, Calaguimit, Calpi, Camagong, Casinagan, Coliat, Del Rosario, Gumabao, Moroponros, Mayag, San Pascual, Pistola, Ramay, San Juan, San Miguel, San Vicente, Talisay, Tablon
SCHEDULED POWER INTERRUPTION DATE: October 21 & 24, 2026 SUBSTATION/FEEDER: Ligao Feeder 1 CONTROL NO: SIOCT2026-159 AFFECTED AREAS: LIGAO - Brgys. Sta. Cruz, Tomolin, Tagpo, Tastas, Pandan, Bobunsuran, Cavasi, Ranao-ranao, Tinampo, San Vicente, Tula-tula Pequeño/Grande, Cullat, Allang, San Jose, Paulba, Tandarora, Busac, Oma-oma, Tiongson, Tupas, San Pascual, San Miguel, Talisay, Tablon, Calaguimit, Francia, Malama, Bacong, Abella, Balanac, Palapas OAS - Brgys. San Pascual, San Miguel, Talisay, Tablon, Calaguimit, Casinagan, San Vicente (Suca), San Juan, Pistola, Gumabao, Calpi, Camagong, Coliat, Banao, Del Rosario, Badbad, Mayag, Ramay, Bangiawan, Moroponros JOVELLAR - Brgys. Mamlad, Estrella PIODURAN - ENTIRE PIODURAN EXCEPT; Brgys. Buenavista, Basicao Coastal REASON: - DISTRIBUTION LINE ENHANCEMENT ACTIVITY - STA. CRUZ TO ALLANG PLEASE CONSIDER OUR LINES ALWAYS ENERGIZED. See less
All areas (10)
Daraga: Bigao, Canarom, Ibaugan, Mayon, Nabasan, San Rafael, San Ramon, San Vicente Grande, Villahermosa
City of Legazpi: Bgy. 66 - Banquerohan
SCHEDULED POWER INTERRUPTION DATE: October 17, 19, & 21, 2026 SUBSTATION/FEEDER: Washington Feeder 3 CONTROL NO: SIOCT2026-156 AFFECTED AREAS: (8:00 AM - 8:30 AM; 4:30 PM - 5:00 PM) LEGAZPI - Brgys. Taysan, Mariawa, Maslog, Homapon, Bagacay, and Poriton of Banquerohan DARAGA - Brgys. Canarom, Mayon, San Ramon, Villahermosa, Bigao, San Rafael, Nabasan, San Vicente Grande, Ibaugan REASON: - MOMENTARY SHUTDOWN OF TAGUNTONG RECLOSER TO FACILITATE THE ISOLATION AND RECONNECTION OF THE BANQUEROHAN DS ------- AFFECTED AREAS: (8:00 AM- 5:00 PM) LEGAZPI - Brgys. Banquerohan (Portion), Imalnod, Bagacay, Cagbacong, San Francisco, Buenavista MUNICIPALITY OF MANITO - ALL COVERAGE AREA REASON: - CONTINUATION - RESTORATION OF DISTRIBUTION LINES FROM SINGLE PHASE TO THREE PHASE LINE FROM BRGY. BANQUEROHAN TO BRGY. CAWAYAN MANITO PLEASE CONSIDER OUR DISTRIBUTION LINES ALWAYS ENERGIZED.
SCHEDULED POWER INTERRUPTION DATE: October 19, 22 & 25, 2026 SUBSTATION/FEEDER: Washington Feeder 2 CONTROL NO: SISEPT2026-157 AFFECTED AREAS: - Momentary (8:00 AM - 8:30 AM; 4:30 PM - 5:00 PM) DARAGA - Brgys. Kilicao, Tagas (Portion), Binitayan, Maroroy, San Roque, Malobago --------------------------- AFFECTED AREAS: - (8:00 AM - 5:00 PM) DARAGA - Brgys. Bañag, Cullat, Bongalon, Busay, Pandan, Lacag, Malabog, Budiao, Alcala, Salvacion, Mi-isi CAMALIG - ALL COVERAGE AREA JOVELLAR - Brgys. Florista (Portion), San Isidro (Portion), San Roque (Portion), Salvacion, Del Rosario GUINOBATAN - Brgy. Minto (Portion) REASON: - DOUBLE CIRCUIT DISTRIBUTION LINE CONSTRUCTION PLEASE CONSIDER OUR LINES ALWAYS ENERGIZED. See less
SCHEDULED POWER INTERRUPTION DATE: October 19, 22 & 25, 2026 SUBSTATION/FEEDER: Washington Feeder 2 CONTROL NO: SISEPT2026-157 AFFECTED AREAS: - Momentary (8:00 AM - 8:30 AM; 4:30 PM - 5:00 PM) DARAGA - Brgys. Kilicao, Tagas (Portion), Binitayan, Maroroy, San Roque, Malobago --------------------------- AFFECTED AREAS: - (8:00 AM - 5:00 PM) DARAGA - Brgys. Bañag, Cullat, Bongalon, Busay, Pandan, Lacag, Malabog, Budiao, Alcala, Salvacion, Mi-isi CAMALIG - ALL COVERAGE AREA JOVELLAR - Brgys. Florista (Portion), San Isidro (Portion), San Roque (Portion), Salvacion, Del Rosario GUINOBATAN - Brgy. Minto (Portion) REASON: - DOUBLE CIRCUIT DISTRIBUTION LINE CONSTRUCTION PLEASE CONSIDER OUR LINES ALWAYS ENERGIZED. See less
All areas (11)
Camalig: Binanderahan, Cabraran Pequeño, Iluluan, Miti, Pariaan, Quinartilan
SCHEDULED POWER INTERRUPTION DATE: October 20 & 23, 2026 SUBSTATION/FEEDER: Ligao Feeder 2 CONTROL NO: SISEPT2026-158 AFFECTED AREAS: LIGAO - Brgys. Tuburan (Portion), Layon, Paulog GUINOBATAN - Entire Guinobatan except Brgy. Minto CAMALIG - Brgys. Iluluan, Manaon, Pariaan, Miti, Binanderahan, Pariaan, and Cabraran Pequeño JOVELLAR - Entire Jovellar except; - Brgys. Florista, San Isidro, Del Rosario, San Roque, Salvacion, and Mamlad REASON: - LINE ENHANCEMENT OF DISTRIBUTION LINE PLEASE CONSIDER OUR DISTRIBUTION LINES ALWAYS ENERGIZED. See less
All areas (2)
#NGCPAdvisory NGCP SCHEDULED POWER INTERRUPTION Date: September 24, 2026 (Saturday) Time: 6:30 AM - 6:30 PM AFFECTED AREAS: ALL AREAS COVERED BY LIGAO AND POLANGUI SUBSTATIONS REASON: • Preventive maintenance along Daraga-Ligao Fuentevera 69kV lines. • Correction of substation defects PLEASE CONSIDER OUR DISTRIBUTION LINES ALWAYS ENERGIZED. See less
All areas (47)
SCHEDULED POWER INTERRUPTION DATE: October 21 & 24, 2026 SUBSTATION/FEEDER: Ligao Feeder 1 CONTROL NO: SIOCT2026-159 AFFECTED AREAS: LIGAO - Brgys. Sta. Cruz, Tomolin, Tagpo, Tastas, Pandan, Bobunsuran, Cavasi, Ranao-ranao, Tinampo, San Vicente, Tula-tula Pequeño/Grande, Cullat, Allang, San Jose, Paulba, Tandarora, Busac, Oma-oma, Tiongson, Tupas, San Pascual, San Miguel, Talisay, Tablon, Calaguimit, Francia, Malama, Bacong, Abella, Balanac, Palapas OAS - Brgys. San Pascual, San Miguel, Talisay, Tablon, Calaguimit, Casinagan, San Vicente (Suca), San Juan, Pistola, Gumabao, Calpi, Camagong, Coliat, Banao, Del Rosario, Badbad, Mayag, Ramay, Bangiawan, Moroponros JOVELLAR - Brgys. Mamlad, Estrella PIODURAN - ENTIRE PIODURAN EXCEPT; Brgys. Buenavista, Basicao Coastal REASON: - DISTRIBUTION LINE ENHANCEMENT ACTIVITY - STA. CRUZ TO ALLANG PLEASE CONSIDER OUR LINES ALWAYS ENERGIZED. See less
SCHEDULED POWER INTERRUPTION DATE: October 19, 22 & 25, 2026 SUBSTATION/FEEDER: Washington Feeder 2 CONTROL NO: SISEPT2026-157 AFFECTED AREAS: - Momentary (8:00 AM - 8:30 AM; 4:30 PM - 5:00 PM) DARAGA - Brgys. Kilicao, Tagas (Portion), Binitayan, Maroroy, San Roque, Malobago --------------------------- AFFECTED AREAS: - (8:00 AM - 5:00 PM) DARAGA - Brgys. Bañag, Cullat, Bongalon, Busay, Pandan, Lacag, Malabog, Budiao, Alcala, Salvacion, Mi-isi CAMALIG - ALL COVERAGE AREA JOVELLAR - Brgys. Florista (Portion), San Isidro (Portion), San Roque (Portion), Salvacion, Del Rosario GUINOBATAN - Brgy. Minto (Portion) REASON: - DOUBLE CIRCUIT DISTRIBUTION LINE CONSTRUCTION PLEASE CONSIDER OUR LINES ALWAYS ENERGIZED. See less
SCHEDULED POWER INTERRUPTION DATE: October 19, 22 & 25, 2026 SUBSTATION/FEEDER: Washington Feeder 2 CONTROL NO: SISEPT2026-157 AFFECTED AREAS: - Momentary (8:00 AM - 8:30 AM; 4:30 PM - 5:00 PM) DARAGA - Brgys. Kilicao, Tagas (Portion), Binitayan, Maroroy, San Roque, Malobago --------------------------- AFFECTED AREAS: - (8:00 AM - 5:00 PM) DARAGA - Brgys. Bañag, Cullat, Bongalon, Busay, Pandan, Lacag, Malabog, Budiao, Alcala, Salvacion, Mi-isi CAMALIG - ALL COVERAGE AREA JOVELLAR - Brgys. Florista (Portion), San Isidro (Portion), San Roque (Portion), Salvacion, Del Rosario GUINOBATAN - Brgy. Minto (Portion) REASON: - DOUBLE CIRCUIT DISTRIBUTION LINE CONSTRUCTION PLEASE CONSIDER OUR LINES ALWAYS ENERGIZED. See less
Oas: Badbad, Banao, Calaguimit, Calpi, Camagong, Casinagan, Coliat, Del Rosario, Gumabao, Moroponros, Mayag, San Pascual, Pistola, Ramay, San Juan, San Miguel, San Vicente, Talisay, Tablon